Detailed Description of Executed Tasks
- Lay bare the steps
- Inspect the step 4×6 wood and decide if it can still be used or if it needs to be replaced
- Take out the steps that need to be replaced and cut new 6×4 wood (~4ft) and drill holes for rebar
- Second step would be to removed and be replaced and put two steps to make it easier for people to go up and down the staircase
- Place the 4×6 in right position supported by gravel and insert rebar with sledge hammer
- Paint untreated wood for the handrail
- Determine the length of the side piece of the box and cut it and use the l brackets to screw it in place
- Refill box with dirt from digging and gravel provided by Ranger Carol
- Dig post holes (~2ft) for new railings approximately every four feet where it matches with a 4×6 beam
- Put beam in hole and use spirit level to make sure it’s straight and screw it into the 4×6 for support
- Mix the Sika post mix and pour it quickly into each of the holes and wait for it to harden
- Replace broken post in the corner of the stairs
- Install missing handrail
- Determine height of the new handrail and cut posts
- Install handrails (painted untreated wood) onto the new posts: Cut to proper length and screw in place, paint edges
- Install horizontal balusters (treated wood): Cut to proper length and screw in place
- Place new side pillars in place of the missing side pillars